> Agents: start at https://frontierintelligencelab.com/llms.txt — API: https://frontierintelligencelab.com/v1/openapi.json

# How to approve a model release

Approve a model release by having a named person sign off on one exact thing: the frozen test cases, the acceptance rule, the run that was scored and the data behind it. Record who approved, when and what, and give readers a way to check the record has not changed since. A chat thumbs-up is not an approval.

## What a release approval should name

A useful approval answers five questions without anyone having to ask the team:

1. **Which cases?** A frozen set of test cases with expected answers, versioned so it cannot change after scoring.
2. **Which rule?** The acceptance rule decided before the run: for example, a minimum pass rate over the full set.
3. **Which run?** The exact candidate run and its settings, not "the latest model".
4. **Which data?** The dataset versions the cases came from, with their file hashes.
5. **Who, and when?** A named person with the right to approve, and the time they did it.

If any of these is missing, the approval cannot be checked later, and it will not survive a customer's or an auditor's question.

## The steps

1. **Freeze the cases and the rule first.** Agree the acceptance rule before you see the candidate's score, so nobody moves the bar to fit the result.
2. **Score the full set.** A subset, or a partial or failed run, should not count toward release.
3. **Review the failures and regressions.** Read every case the new version got wrong that the old one got right.
4. **Approve as a named person.** The approver should be someone accountable for the release, ideally not the person who trained the model. For higher-risk releases, require a second approver.
5. **Export the record and let others check it.** The record should travel with the model, and anyone holding it should be able to check it without access to your workspace.

## How Valcairn does it

- **A named approver per project.** A workspace owner or admin can name a suggested approver for each project. Approving reports and releases is limited to workspace owners and admins.
- **Two-person approval** can be turned on as a workspace security setting.
- **The approval binds a hash.** Valcairn hashes the chain (case set version, acceptance rule, run and its settings, source dataset versions and every case outcome) with SHA-256. A later change to any of them voids the approval.
- **A signed export.** When the server has a release key, the export carries an Ed25519 signature over a statement naming the approval, its content hash, the workspace, project, run, the approver's account, confirmed email and role, and the time.
- **A public check.** Anyone can drop the export on [the release check page](/check). The check runs in the browser against the key the site publishes; the file is not uploaded. There is also a single-file Node.js checker for offline use.

## What a signed record proves, and what it does not

A passing check shows the record has not changed since it was approved, and that the holder of the published Valcairn key signed it, naming the approver and the date.

It does not show that the model does well beyond the cases in the record, that it is safe or fit for a particular use, or which data training really used. Training inputs are reported by the customer's own machine and are not witnessed by Valcairn. We say this on every check result, and you should say it to your own readers.

Release approval and signed exports are part of the Team plan; see [pricing](/pricing).

## Questions

### Who should approve a model release?

A named person accountable for the release, with the authority to stop it. Ideally not the person who trained the model. For higher-risk releases, require two approvers.

### What is a signed release record?

A file that names what was approved (cases, rule, run, data), who approved it and when, with a digital signature. Anyone with the issuer's public key can check the file has not been changed since it was signed.

### Can someone check a Valcairn release record without an account?

Yes. Drop the exported file on the release check page at /check. The check runs in your browser against the key Valcairn publishes, and the file is not uploaded. Reading a shared record uses no seat.

### Does an approved release mean the model is safe?

No. An approval records that a named person accepted the model on specific cases under a specific rule. It says nothing about cases outside that set, and it does not certify safety or fitness for a use.
